View single post by getech.org.uk
 Posted: Fri Oct 3rd, 2014 09:09 pm
PM Quote Reply Full Topic
getech.org.uk

 

Joined: Fri Jun 24th, 2011
Location: Leeds, United Kingdom
Posts: 52
Status: 
Offline
Mana: 
If OPTL / ATL becomes mandatory then all you will need is a lift fitted with play detectors and a pair of convex mirrors + brake pedal depressor.

Don't forget a VT01 form though before you do anything...

More than likely the lift is going to be wider and longer than your existing lift so some groundwork is probably going to be required if the lift is recessed. Assuming this is the case and your station was approved before November 2010 then the distance between the rollers and rear crossbeam of your lift (assuming your in line recessed) will be 1.5m or thereabouts - there is a smaller requirement here now in dimensional terms so it will all squeeze in...

Hope that helps...

DM me if you need further help...