Moderated by: Stealth, MOTman, KevG, bimmer |
|
site assesment | Rating: ![]() |
Author | Post |
---|
Posted: Thu Feb 27th, 2014 04:36 pm |
|
1st Post |
billyloadsamud Member
![]() |
I believe the lower the figure the better the risk, GREEN for you, well done
|
||||||||||||||
|
Posted: Wed Nov 27th, 2013 06:22 pm |
|
2nd Post |
afiafi1 Member
![]() |
someone must now what figure they used for red/amber/green
|
|||||||||||||
|
Posted: Tue Nov 26th, 2013 08:24 pm |
|
3rd Post |
afiafi1 Member
![]() |
had my second site assesment from the paperwork ve left with me i used the site assement calculator and copied my marks my risc score was be 111.7 anyone now what score is green amber and red
|
||||||||||||||
|
Current time is 11:46 pm | |
MOT Forum - The MOT Testing Forum for the UK MOT Testing Industry > Trade Category (MOT Trade Discussions) > DVSA/VOSA Performance Monitoring - bad experience? Let us know | MOT Forum > site assesment | Top |